DESIGN, SUPPLY OF MATERIAL AND CONSTRUCTION OF
FLOW LINES AND ASSOCIATED WORKS FOR OIL WELLS AT GC-27 AND GC-28 |
Client: |
Kuwait Oil Company |
Project Value: |
US$ 27 Million |
Duration: |
1997-1999 |
Brief Scope of work: |
The project was to construct cross-country pipe lines (Flow Lines) to
run crude oil from oil wells to new Gathering Centers GC-27 and GC-28.
The Scope included:-
Survey of Pipe routes and preparation of Route Drawings
-
Design, Supply and Construction 800 km of cross-country pipelines
-
Supply of valves and fittings
-
Design and Construction of platforms and pipe support structures
-
Design and Construction of Well Hand Fencing
-
Design, Fabrication, Supply and Installation of Pipe Heaters
-
RCC
|
|
Top |
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF STEAM
SYSTEM REVAMP PROJECT (SSRP) AT MINA ABDULLA REFINERY |
Client: |
Kuwait National
Petroleum Company |
Project Value: |
US$ 23 Million |
Duration: |
1997-2000 |
Brief Scope of work: |
The Scope of Work was Detail Engineering, Preparation of Equipment
Specification and Data Sheets, Procurement of Equipment and Materials and Construction
of Plant, inclusive of the following:-
Steam Boilers
-
Boiler Feed Water Pump
-
11 KV Packaged Substation
-
Instrumentation & Control Systems (DCS)
-
Fire Fighting and Fire Alarm System
-
Communication System
-
Standby Generator
-
Piping System (Inch-meter 90000)
-
RCC
-
Lighting System
-
Access Road and Landscaping
-
Structural - 280 tons
|
Top |
FUEL OIL SUPPLY PROJECT (FOSP) |
Client: |
Kuwait National Petroleum Company |
Project Value: |
US$ 18 Million |
Duration: |
1997-1999 |
Brief
Scope of work:
|
The Project was to enhance its fuel oil supply to the Doha Power Plant
of the Ministry of Electricity & Water, via pipeline to meet the higher
fuel demand. The scope of the project was Design, Detail Engineering,
Preparation of Equipment Specifications, procurement, Supply of
Equipment & Materials, Construction, Testing and Commissioning of Fuel
Oil Pumping System.
The main equipment and construction works involved were:-
Design Engine for Pump
-
Diesel Engine-driven Pump
-
Electrical Motor-driven Pump
-
11 KV Packaged Substation
-
Instrumentation & Control Systems
-
Fire Fighting and Fire Alarm Systems
-
Communication Systems
-
Metering System
-
Piping System
-
Control Room Building
-
Lighting System
-
Access Road and Landscaping
|
Top |
DESIGN, DETAIL ENGINEERING AND CONSTRUCTION
OF AHMADI DEPOT AND MODERNIZATION OF SABHAN DEPOT |
Client:
|
Kuwait National Petroleum Company
Local Marketing Department |
Project Value:
|
US$ 17.5 Million |
Duration: |
1996-1999 |
Brief Scope of work: |
The Project Was to Design and Construction a fully Automatic, unmanned,
new product distribution center for KNPC at Ahmadi and modernize the
existing depot at Saban to increase the efficiency of local distribution
of Petroleum Products in Kuwait. The scope of work included Design,
Detail Engineering, Preparation of Equipment Specification, Procurement
of Equipment & Material and Construction of Depot, Inclusive of the
following:-
Control Room/Substation/Office Buildings
-
Loading & Unloading Gantry
-
Tankage
-
11 KV Substation
-
Instrumentation & Control Systems (DCS)
-
Fire Fighting & Alarm System
-
Communication System
-
Metering System
-
Piping System
-
Cathodic Protection
-
Automation System
-
Access Road & Landscaping
-
Structural works
|
Top |
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION AND
COMMISSIONING OF EMERGENCY GENERATOR SYSTEM FOR PUMPING STATION |
Client: |
Shuaiba Area Authority |
Project Value :
|
US$ 13 Million |
Duration: |
1994-1997 |
Brief Scope of Work: |
The Project was to provide a 18 MW Standby Power Supply System to
Shuaiba Area Authority Sea Cooling Water Pumping Plant C. The cope
included design, supply , Construction and Commissioning works inclusive
the following:
The main equipment and construction works involved were:-
Diesel Engine of Generator
-
2 Nos. 8 MW Generators
-
Electric Motor driven pump
-
11 KV Switch Gear
-
PLC based Control System
-
Fire Fighting and Fire Alarm Systems
-
Heat Exchangers
-
Piping System
-
Plant Building
-
RCC
-
Structural Work
|
Top |
DESIGN, MANUFACTURE, SUPPLY & INSTALLATION COMMISSIONING AND
MAINTENANCE OF 6 NOS. 12,000 Cu.M/hr SEA COOLING WATER PUMPS |
Client: |
Public Authority for Industries (PAI) |
Project Value: |
US$ 12 Million |
Duration: |
1994-1997 |
Brief Scope of work:
|
The scope consisted of Design, Supply and Construction jobs in
association with the modification of the Pumping Plant of Shuaiba of
Area Authority.
The main equipment and works are as follows:-
12000 cu.m/hr Sea Cooling Water Pumps – 6 Nos
-
Band Screen
-
Pump Motors
-
Cathodic Protection
-
Main Heater
-
Pump Chamber
-
H.V. Electric Systems
-
Instrumentation and Control System
-
Structural works
|
Top |
CONSTRUCTION OF NEW GATHERING CENTER – GC-25 |
Client: |
Kuwait Oil Company/Daelim Engineering & Construction Company |
Project Value: |
US$ 10 Million |
Duration: |
1998-2000 |
Brief Scope of Work: |
The work consisted of construction, testing and Commissioning of
complete Underground and Aboveground Piping, including painting works
for the following:-
Manifold Area - Process Liquid Lines
-
Flare Area - Blow Down Lines
-
Fire Protection - Fire Water Lines
-
Utilities - Various Drain Lines
-
Pig Launcher Area - Export Lines
-
Brackish Water & Domestic Water Lines
-
Process Condensate & Process gas lines
-
NACE specified Fuel Gas Lines
-
Structural Erection Work of Various Shelters
-
Painting of Pipelines and Shelters
|
Top |
BOILER MAKE-UP WATER TREATMENT PLANT-SOUTH SHUAIBA POWER STATION |
Client: |
Ministry of
Electricity & Water
Government of Kuwait |
Project Value:
|
US$ 5.1 Million |
Duration: |
1993-94 |
Brief Scope of work: |
Design, Supply & Construction of Boiler Make-up Water Treatment
Plant including –-
Plant Building
-
Steel Tanks & Vessels
-
Structural Steel
-
Pumps
-
Chemical Injection Systems
-
Piping
-
PLC based Control System Installation
-
Plant Electrical System
-
Instrumentation System
-
Analyzers
|
Top |
DESIGN AND INSTALLATION OF INTER-REFINERY TRANSIT LINES (IRT
PIPELINES) |
Client: |
Kuwait National Petroleum Company/Flour International Limited |
Project Value:
|
US$ 3.75 Million |
Duration: |
1996 |
Brief Scope of work: |
The Project was to construct an inter-Refinery Cross-country Transit
Lines 24” dia between Shuaiba Refinery and Mina Al-Ahmadi Refinery for
transfer of various petroleum products. The scope of work included Field
Survey, Design & Detail Engineering, Supply of partial materials
Construction of 24” cross-country pipeline and associated works
inclusive of:-
Pipeline 18” - 24” - 8 Kms
-
Motor operated Valves
-
Cathodic Protection
-
Pipe Rack & Platforms
-
Electrical System
-
Instrumentation System
-
Valves Pits
-
Structural Works
-
RCC
|
Top |
DESIGN & DETAIL ENGINEERING OF PRODUCT LOADING AND UNLOADING
PIPELINES AT BERTH 13, SHUAIBA PORT |
Client: |
EQUATE Petrochemical Complex/ Flour International Limited |
Project Value: |
US$ 3.4 Million |
Duration: |
1997 |
Brief Scope of Work: |
The Project was to design and construct all facilities for loading and
unloading of various petroleum products for the Equate Petrochemical
Plant to the ships and vice versa. The scope of work consisted of
Design, Detail Engineering, Supply of all materials (except piping) and
construction of the following facilities:
|