Replacement of corroded hydro-carbon piping
in sections in gas plant at Mina Al-Ahmadi Refinery |
Client: |
Kuwait National
Petroleum Company |
Project Value: |
US$ 6.5 Million |
Duration: |
2002-2003 |
Brief Scope of work: |
Supply of all specified piping materials, tools & tackles, cranes,
manpower, materials, equipment, consumables, scaffolding and all
required items and perform the replacement of corroded hydro-carbon
piping in Gas Plant in Mina Al-Ahmadi Refinery |
Top |
General services for maintenance of Data
Monitoring Center (DMC), Irrigation Pumping Station (IPS) and
environmental affairs |
Client: |
Ministry of Public
Works |
Project Value: |
US$ 4.9 Million |
Duration: |
2000-2003 |
Brief
Scope of work:
|
Administration, Maintenance and Operational all Mechanical, Electrical &
A/C Systems, complete operation of nine Pumping Stations, Header Tank,
Environmental Lab at Ardhiya and Telemetry System |
Top |
Engineering, procurement and construction of
acid gas removal – feed filtration facilities at Shuaiba
Refinery |
Client: |
Kuwait
National Petroleum Company |
Project Value:
|
US$ 3.8 Million |
Duration: |
2000-2002 |
Brief Scope of work: |
Scope includes checking and verification of the FEED Package, Design,
Engineering, Procurement and Supply of Materials and Equipment, Erection
and Construction, Pre-commissioning, Start-up and Commissioning of the
Facilities and Performance Test. |
Top |
Provision of manpower & equipment for survey
and revamping of production facilities (BS-150 & all Gathering
Centers) in South and East Kuwait areas |
Client: |
Kuwait Oil Company |
Project Value :
|
US$ 2.03 Million |
Duration: |
2001-2003 |
Brief Scope of Work: |
Supply of qualified, experienced and skilled personnel, tools, vehicles,
equipment and site offices described in the Contract as and when
required by Kuwait Oil Company for carrying our revamping work at the
Company’s Production Facilities in South and East Kuwait Areas. |
Top |
Engineering, procurement and construction of
combined flare stack for RMP/FUP acid gas at KNPC MAA Refinery |
Client: |
Kuwait National Petroleum Company
Mina Al-Ahmadi Refinery |
Project Value: |
US$ 1.6 Million |
Duration: |
2000-2002 |
Brief Scope of work:
|
Design, Engineering, Procurement, Supply of Materials & Equipment,
Erection and Construction, Pre-commissioning, Start-up and Commissioning
of the facilities and performance testing of the Flare Stack. |
Top |
Upgrading of existing drain sump vessels at all gathering
centers in South-East Kuwait oil fields: |
Client: |
Kuwait Oil Company |
Project Value: |
US$ 1 Million |
Duration: |
2002-2003 |
Brief Scope of work: |
Detail Engineering, Procurement, Supply and Construction, Construction
Engineering, Installation, Testing, Pre-commissioning and assistance in
commissioning of the Drain Sump Vessels in the Gathering Centers |
Top |
Operation, maintenance
and repairs of mechanical equipment at G- 1 Mubharakhya camp |
Client: |
Ministry of Defence |
Project Value:
|
US$ 0.7 Million |
Duration: |
2001-2004 |
Brief Scope of work: |
Complete Operation, Maintenance and Repairs of Mechanical Equipment at
G- 1 Mubharakhya Camp of the Ministry of Defence. |
Top |
Operation,
maintenance and repairs of mechanical equipment at 15th army
brigade |
Client: |
Ministry of Defence |
Project Value:
|
US$ 0.6 Million |
Duration: |
2001-2004 |
Brief Scope of work: |
Complete Operation, Maintenance and Repairs of Mechanical Equipment at
15th Brigade for Ministry of Defence. |
Top |
Operation maintenance and repairs of mechanical equipment at Ali
Al-Jaber air base: |
Client: |
Ministry of Defence |
Project Value: |
US$ 0.6 Million |
Duration: |
2001-2004 |
Brief Scope of Work: |
Complete Operation, Maintenance and Repairs of Mechanical Equipment at
Ali Al-Jaber Airbase of the Ministry of Defence |
Top |
Electrical &
instrumentation works at gathering center no.15 (GC-15) |
Client: |
Daelim Engineering Company/Kuwait Oil Company |
Project Value: |
US$ 0.5 Million |
Duration: |
2001-2002 |
Brief Scope of Work: |
Electrical and instrumentation Works including Commissioning of the
system for Upgrading Desalter/Dehydration at GC-15, North Kuwait. |
Top |
National project for rehabilitation of Kuwait
Hospitals |
Client: |
Ministry of Health |
Project Value: |
US$ 9 Million |
Duration: |
2001-2004 |
Brief Scope of work: |
Maintenance works at Psychiatry Hospital and Contagious Diseases
Hospital (Area 3) |
Top |
Airconditioning/Civil/Electrical maintenance
works |
Client: |
Ministry of Health |
Project Value: |
US$ 6.5 Million |
Duration: |
1999-2002 |
Brief Scope of Work: |
Air-Conditioning, Civil and Electrical Maintenance works at different
locations of the Ministry of Health. |
Top |
General maintenance &
minor construction works |
Client: |
Ministry of Health |
Project Value: |
US$ 3.6 Million |
Duration: |
2001-2003 |
Brief Scope of work: |
General Maintenance and minor construction works at Farwaniya and Jahra
hospitals of the Ministry of Health. |
Top |
General maintenance – Kuwait Municipality |
Client: |
Kuwait Municipality |
Project Value: |
US$ 3.2 Million |
Duration: |
2001-2003 |
Brief Scope of Work: |
General Maintenance Works for Kuwait Municipality at Ahmadi Area.
|
Top |
General maintenance – Ministry of Interior |
Client: |
Ministry of Interior |
Project Value: |
US$ 3.2 Million |
Duration: |
2000-2003 |
Brief Scope of Work: |
Maintenance works for the Ministry of Interior at Capital District.
|
Top |
Maintenance works - Ministry of Electricity &
Water |
Client: |
Ministry of Electricity & Water |
Project Value: |
US$ 2.9 Million |
Duration: |
1999-2002 |
Brief Scope of Work: |
Maintenance works for Ministry of Electricity & Water at South Region |
Top |
National project for rehabilitation of Kuwait
Hospitals |
Client: |
Ministry of Health |
Project Value: |
US$ 1.9 Million |
Duration: |
2002-2004 |
Brief Scope of Work: |
Maintenance works and minor construction works at Mubarak
Hospita |
Top |
Installation of HVAC System |
Client: |
Bugan Company |
Project Value: |
US$ 1.3 Million |
Duration: |
2000-2002 |
Brief Scope of Work: |
Supply and Installation of HVAC system at the Shuwaikh Site of the
Client
|
Top |
Electrical maintenance works |
Client: |
Public Authority for Applied Technical Education |
Project Value: |
US$ 1 Million |
Duration: |
2000-2002 |
Brief Scope of Work: |
Electrical Maintenance at various locations in the First Area of the
Public Authority for Applied and Technical Education |
Top |
Electrical
maintenance works |